SolarWorld – 250 KW

SolarWorld Campus (Blue Ferret) – 250 KW
Hillsboro, Oregon
Customer: SolarWorld
Services: EPC
Completion Date: December 2015

hillsboro

Douglas had the privilege to design the first Solar Plant owned by Solarworld in America. In this small but complex project, Douglas had the challenge to design strings with a variety of power and technology of modules, a total of 11 inverters, and Solarworld Sunfix racking on a berm with wavy terrain (no adjustments to the terrain were allowed). Douglas performed EPC services and supervised on site contractor Sunlight Solar. Douglas installed for the first time the Bisun double sided module (10.5kw) and personally performed commissioning and troubleshoot inverter issues throughout the project. Douglas is constantly monitoring the system through Also Energy subscription and preparing energy reports for module and inverter comparisons. The project was successfully commissioned in December of 2015.

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s