Tampa International Airport – 2 MW
Tampa, Florida
Customer: Solar Source
Services: EPC
Completion Date: December 2015

tampa

2 MW Tampa Airport is the first of many large projects by Tampa Electric Company. Douglas provided all the engineering design to PE Engineer in Florida using 72 cel 325w SolarWorld modules, and 2 SMA central inverters. The scope of work included demolishing of existing HPS parking lot lighting and to engineer new LED lighting under a new canopy under IES standards. Redesign of existing fire alarm system of the top floor, and cable tray design from combiner boxes to inverters located at ground level. The project interconnects to the grid using a dual secondary winding MV transformer. The project was successfully commissioned in December of 2015.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s