Solar Plan Set Process Explained

Isometric solar plan quality review workflow from drafting to permit submission

How an installer’s intake package becomes an AHJ-ready solar plan set in 2-3 business days, with an independent senior-designer review before delivery.

PV Disconnect Placement: NEC 2017 vs. NEC 2023 Requirements

Photovoltaic modules following the curve of a barrel-vaulted commercial roof

NEC 2023 690.12 rapid shutdown uses the same numbers NEC 2017 set: a 1-foot array boundary, 30 volts outside it and 80 volts inside it, both within 30 seconds. The physics hasn’t moved since 2017 — what changed is where the marking rule lives, plus a new exception for carports and other detached structures. If […]